GC Solar Commercial Project Reference List – Total Project As Of March 2017 = 2,322.6kW

(Most Commercial Solar PV Designed & Installed in Washington State)

1,108.4 kW DC Solar Photovoltaic Ballasted Roof Mounted System.  Workscope included preliminary design including Federal, State, Utility and Energy Trust of Oregon incentives, store roof solar incidence surveys, array sizing and Autocadd layouts, technical calculations, preliminary one-line electrical design drawings, and discussions with PGE and Pacific Power utilities for six store locations in Oregon.  Safeway Incorporated.

Reference:  President of Energy Operations, number available upon request.

 

355.00 kW DC Solar Photovoltaic Roof Mounted System, Finn Hill Middle School, Kirkland, WA for the Lake Washington School District #414.  GCS provided installation services for Arcadia Electric, prime electrical contractor.  The services included field education, standing seam roof mounting installation, and  NEC code compliant wiring for this second largest commercial school project in the State of Washington to date.

Electrical Prime Reference:  Michelle Palmer/Robert Taylor.

 

198.72 kW DC Solar Photovoltaic Roof Mounted System, Odle Middle School, Bellevue, WA for the Bellevue School District.  GCS’s ongoing services provide design, installation, testing, commissioning, warranty, web monitoring, Owner training and preparation of an Operations & Maintenance manual.  The system uses state-of-the-art ballasted racking from Sunlink never before used in the City of Bellevue. The system meets all Utility, City, State, IBC and NEC codes.

Reference:  Kyle McLeod, School District project management.

Recommendation letter: available   Photos:  CD available.

 

100.72 kW DC Solar Photovoltaic Roof Mounted System, Enatai School, Bellevue, WA for the Bellevue School District.  GCS’s ongoing services provide design, installation, testing, commissioning, warranty, web monitoring, Owner training and preparation of an Operations & Maintenance manual.  The system uses state-of-the-art electrical inverters from SMA America known global wide for robustness. The system meets all Utility, City, State, IBC and NEC codes.

Reference:  Kyle McLeod, School District project management.

 

99.4 kW DC Solar Photovoltaic Roof Mounted System, Sammamish High School, Bellevue, WA for the Bellevue School District.  GCS’s ongoing services provide design, installation, testing, commissioning, warranty, web monitoring, Owner training and preparation of an Operations & Maintenance manual.  The system uses another state-of-the-art ballasted racking from Sunlink never before used in the City of Bellevue. We provided extensive wind and seismic dynamic modeling to confirm reactions  to meet  City structural engineer’s approval.  In additions, the system meets all Utility, City, State, IBC and NEC codes.

Reference:  Kyle McLeod, School District project management.

99.8 kW DC Solar Photovoltaic Roof Mounted System, Cherry Crest Elementary School, Bellevue, WA for the Bellevue School District.  GCS provided design, installation, testing, commissioning, web monitoring, warranty, Owner training and preparation of an Operations & Maintenance manual.  The system is the first approved ballasted system in the City of Bellevue. We provided extensive wind and seismic dynamic modeling to confirm reactions  to meet  City structural engineer’s approval.  In additions, the system meets all Utility, City, State, IBC and NEC codes.

Reference:  Kyle McLeod, School District project management.

Recommendation letter: available upon request.  Photos:  CD available.

 

98.9 kW DC Solar Photovoltaic Roof Mounted System, Riverview Elementary School, Snohomish, WA for the Snohomish School District #201.  GCS provided design, installation, testing, commissioning, web monitoring, warranty, Owner training and preparation of an Operations & Maintenance manual.  The system enables smart grid technology for energy analysis/student learning.  The system meets Utility, City, State, IBC and NEC codes.

Accelerated Installation schedule:  rooftop system, 9 days.

Reference:  Konnie Surmann, project management.

Reference:  Philip Riedel, Northwest Architectural Company.

Recommendation letter: available upon request.  Photos:  CD available.

 

80.0 kW DC Solar Photovoltaic Roof Mounted and Structural Awning System, Lower Columbia College, Longview, WA.  GCS design, installation, testing, commissioning, web monitoring, warranty Owner training and preparation of an Operations & Maintenance manual for a standing seam metal roof and two structural awnings.  The system utilizes high tech Lumos modules requiring structural steel joist construction by GCS to ¼” tolerance.  In addition the system uses 11 SMA America inverter with web monitoring for energy analysis/student learning.  The system meets Utility, City, State, IBC and NEC codes.

Electrical Prime Reference: Prairie Electric, Colter Nichols, Photos:  CD available.

Recommendation letter from City of Longview Electrical inspector is available upon request.

 

24.0 kW DC Solar Photovoltaic Roof System,  Salish Sea Research Facility,  for the Lummi Indian Nation. GCS provided design for standing seam metal roof, installation, testing, warranty, web monitoring, commissioning and Owner training with Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes.

Reference:  Lummi Indian Nation.

           

15.3 kW DC Solar Photovoltaic Roof System,  Redmond High School Phases One and Two, Lake Washington School District #414.  GCS provided design, installation, testing, web monitoring, commissioning, warranty, performed Owner training and prepare an Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes.

Reference:  Chuck Collins, Cascade Consulting Group.

 

15.0 kW DC Solar Photovoltaic Roof Mounted Tilted Single Array System, Academic and Student Support Building, Skagit Valley College, Mt. Vernon, WA.  GCS provided design, installation, testing, web monitoring, commissioning, warranty, Owner training and preparation of an Operations & Maintenance manual for a structural single tilt system from Unirac.  The system required special steel beam supports and welding attachments to roof decking.  The system meets Utility, City, State, IBC and NEC codes.

Reference:  Mark Tyler, Seahurst Electric.  Photos:  CD available.

 

14.8 kW DC Solar Photovoltaic Roof Mounted System, Lake Washington High School, Kirkland, WA for the Lake Washington School District #414.  GCS provided design, installation, testing, warranty, web monitoring, commissioning, training and preparation of an Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes.

Reference:  Dave Milne, Milne Electric, Photos:  CD available.

 

10.8 kW DC Solar Photovoltaic Roof Mounted System, Kenmore City Hall, Kenmore, WA.  GCS performed services under the General Contractor Graham Contracting, included design, installation, testing, startup, warranty, training and Operations & Maintenance manual.  The permitted system met all Utility, City, State, IBC and NEC code requirements.

Reference:  Jennifer Gordon, Public Works Manager, City of Kenmore.

 

10.5 kW DC Solar Photovoltaic Roof Mounted System, City of Tacoma,  GCS provided design, installation, testing, startup, web monitoring, warranty, training and Operations & Maintenance manual for new City transfer station.  The permitted system met all Utility, City, State, IBC and NEC code requirements. Reference:  Jim Nunn, City Facilities Supervisor.

 

10.2 kW DC Solar Photovoltaic Roof System,  Carl Sandberg Elementary for the Lake Washington School District #414.  GCS provided design, installation, testing, warranty, web monitoring, commissioning and Owner training with Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes. Reference:  Lake Washington School District.

 

10.2 kW DC Solar Photovoltaic Roof System,  Alexander Graham Bell Elementary for the Lake Washington School District #414.  GCS provided design for standing seam metal roof, installation, testing, warranty, web monitoring, commissioning and Owner training with Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes. Reference:  Lake Washington School District.

 

10.0 kW DC Solar Photovoltaic Roof System, Auburn High School.  GCS is providing ongoing services for design, installation, testing, warranty, web monitoring, commissioning and Owner training with Operations & Maintenance manual.  The system meets all Utility, City,  IBC and NEC codes. Ref:  Auburn School District.

Owner Reference:  Leo Emerson, School District construction administrator.

Electrical Prime Reference: Valley Electric, George Harding, Joe Tremblay.

9.6 kW DC Solar Photovoltaic Roof Mounted Tilted Single Array System, Columbia Boulevard Wastewater Treatment Plant, City of Portland, Oregon.  GCS provided design, installation, testing, web monitoring, commissioning, warranty, Owner training and preparation of an Operations & Maintenance manual for a custom structural single tilt system.  The system required special aluminum welding attachments to roof decking.  The system meets Utility, City, State, IBC and NEC codes. Reference:  Ryan Richards, Skanska.  Photos:  CD available

 

8.6 kW DC Solar Photovoltaic Roof System, Pole Mount Tracker System and Wind Turbine,  SAMS CLUB, Stephenville, TX for Sam’s Club ECO House Makeover Contest at a local residence.  Services included design, installation, testing, startup, training and Operations & Maintenance manual.  First permitted commercial solar PV/wind energy system in City.  Completed in 2 weeks.

Reference:  John Baxter.  Photos:  CD available.

 

7.6 kW DC Solar Photovoltaic Roof System, Juanita High School), for  the Lake Washington School District #414.  GCS provided design, install, test, startup, perform training and prepare an Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes.

Reference:  Chuck Collins, Cascade Consulting Group.

 

7.0 kW DC Solar Photovoltaic Roof System,  Bellevue Community College GCS provided design, installation of roof awning system, testing, startup, commissioning, warranty, Owner training and preparation of an Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes. Reference:  Bellevue College, Derik Green.

 

6.7 kW DC Solar Photovoltaic Roof System,  Eastlake High School), for the Lake Washington School District #414.  GCS provided design, install, test, startup, provided warranty, performed training and prepared an Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes.

Reference:  Greg Harris, State Electrical Inspector, Dept of Labor and Industries.

 

5.8 kW DC Solar Photovoltaic Roof System,  OPSCO (Canadian Gas Service Company), Sand Draw, WY.  Services included design, installation, testing, startup, training and Operations & Maintenance manual.  Reference:  Alex Alberdi.   Photos:  CD available.

 

5.4 kW DC Solar Photovoltaic Roof System,  Renton Learning Center for the Renton School District.   GCS provided design, installation of roof awning system, testing, startup, commissioning, Owner training and preparation of an Operations & Maintenance manual.  The system met all Utility, City, State, IBC and NEC codes. Reference:  Northwest Architectural Consultants, Seattle.

 

4.2 kW DC Solar Photovoltaic Roof System,  Interlake High School, Bellevue, WA for the Bellevue School District #405.  Services included design, installation, testing, startup, training and Operations & Maintenance manual.  First permitted commercial solar PV system in City with population of 120,000.  Completed  in 7 days.  Reference:  Kyle McLeod.

Recommendation letter: available upon request.

 

2.0 kW DC Solar Photovoltaic Wall Mounted System, Snoqualmie Ice Cream Factory, Maltby, WA for the Bonneville Environmental Foundation. Services included design, installation, testing, startup, training and Operations & Maintenance manual.  Design required structural engineering of two 32 foot long steel support beams.  The system met all Utility, City, State, IBC and NEC code requirements. Reference:  BEF.

Photos:  CD available upon request.

 

2.0 kW DC Solar Photovoltaic Roof System, Cedarwood Elementary, Bothell, WA for Everett Public Schools Services included design, installation, testing, startup, training and Operations & Maintenance manual.  The permitted system met all Utility, City, State, IBC and NEC codes.

Reference:  Chuck Booth. Photos:  CD available.

 

1.4 kW DC Solar Photovoltaic Pole Mounted System, Stanwood High School, Bothell, WA for the Stanwood Camano School District.  Services included design, installation, testing, startup, training and Operations & Maintenance manual.  The permitted system met all Utility, City, State, IBC and NEC codes. Photos:  CD available.

 

1.0 kW DC Solar Photovoltaic Pole Mounted System, Snohomish High School, Bothell, WA for the Snohomish School District #201.  Services included design, installation, testing, startup, training and Operations & Maintenance manual.  The permitted system met all Utility, City, State, IBC and NEC codes.

Reference:  Steve Cotterill. Photos:  CD available